Showing posts with label remodeling ruminations. Show all posts
Showing posts with label remodeling ruminations. Show all posts

Friday, February 13, 2009

...D.O.N.E.[aka Friday the 13th has ALWAYS been a "lucky day" for me...]

on May 29, I posted this picture as a "summer project"...
[BOY... was I WRONG...]



on June 20th, not much had changed...
though I was in a cleaning frenzy...
[that's Cagney, "observing"...]



by August 20, I was in full "bath redo mania" mode...
trashing the window sill for the window repair...
and anticipating the coming "early Sept." start date...



then...up came a BIG stop sign...

and it all came to a screeching halt...

as I tried to understand why...
the thought came to me...

"just be patient...
those were NOT the right guys...
I'll provide the right ones...
wait until after the first of the year..."


and then I had a real peace about it...

so I waited...

in Dec, I was prodded to take Molly for a walk...
and met G, just down the street...
if I hadn't gone then, I would have missed him altogether...

he's definitely been "the right guy"...
and so have all the guys he's brought in...

BTW... the 1st glass guy, who was raising the price & being obnoxious...
was not G's "guy"...G's "guy" did just what I wanted & for less...

so when we started on January 6...



the bathroom looked like this...



an hour or so into demo, like this...



and by early afternoon, most of the old bath was here...
ready to "go away"...



leaving holes in the wall & floor...
due to dry rot repair...
and for the first 2 or 3 nights...
an outhouse kind of existence for me...

skipping ahead to today...

I was eagerly awaiting G's arrival...
for the hot water "fix" & a couple of last things...



the shower glass installation was now complete & cured...
we just needed the hot water to work properly...
[ie..."at all"...]



G wasted no time in taking the shower head off...
and taking apart the hot water valve...



then he first used compressed air to clear the pipes...
[after shutting off the water...]



then finally, water...
here you see hot water gushing out of the line...



when the water drained out...
there was something left on the drain...



it seemed to be brown paper...



it must have been inside the shower valve assembly...
and gotten moved by the water over the valve...
restricting, then stopping the flow...



with the shower put back together...
G put this in place for me...



this, "over the door" type storage basket...
fits perfectly "over the header" of the shower wall...



then, to help me out...
since I have trouble using "Frankenfinger"...
[so aptly-christened by MM...]
he unscrewed the filter from the sink faucet...



so that I can hook-up the plant watering hose to the faucet...
& water my plants...& boy, do they need it...



now...the work is finally done...
and all that is left to do...
is to move everything back in...



quite a difference...

thank you to G, R & all the guys, who were the "right guys"...

I got just what I wanted & needed...
the aggravation factor was very low...
the workmanship was stellar...
and the price was great !

I'd also like to thank all those of you who read...
left comments, suggestions & encouragements...
you really helped me get through this...
and for those of you who've "helped"...
in various ways...you have truly been a "Godsend"...

and finally, to the author of everything...
the little voice that said, "wait"...
and "go for a walk" and then just took care of everything...
He was MOST definitely, in ALL the details...

thank you, God...You are so good...

Thursday, February 12, 2009

...all the glass is done

while I was dozing, "watching" the History Channel...
waiting for G to come & work on the hot water supply problem...
[post script...who will now be coming on the morrow...]

S arrived to install the sash window glass...

I had a pang, watching him remove what I had installed in the summer...
but when he had a smooth install of the new "rain" glass...
[because I was so anal in glazing removal last summer...]
and then he installed it, almost exactly the same way I did...
[except he used glazing points...he IS a pro...]
I lost that pang, & began to feel pretty good...

et, voila...



symmetry, harmony and shiny things...
[have I mentioned that I have a weakness for "shiny"?]
and it all looks even better than I imagined...

and this glass, including the "free" sash window...
cost less than we first thought the shower door/glass panel would...
it was only $800.00...materials & labor...

COOL...

now, "hot water, please..."

thank you, God, very much...

Wednesday, February 11, 2009

..."sur-prise, sur-prise, sur-prise..." [รก la "Gomer Pyle"]

it was a bit after 2 PM...
I was contemplating a nap...
when Molly started barking the "intruder alert" signal...
I looked on the front porch, and there was S & helper...
ready to install the shower door/glass...!

and the shower was waiting...just as they had left it last Friday...



when the large panel & the door were the wrong size...



so they got busy, measuring & pretty soon, the frame was taking shape...



turns out the window pane they forgot...
would've had to wait for tomorrow anyway...
due to the downpour that was to come...
right when they would have installed it...



the door and other panels came in...



and were soon being dry-fit & leveled...



the side panel was dry fit, then installed...



pretty soon, my "shop steward"was supervising the gasket installation...



seen here in a close-up...

the gasket would be followed by a sealing/caulking with silicon...
around all joints, in all panels...



through it all, S.Pie, "forecat extraordinaire"...
kept her eye [& paw] in everything...
inspecting everything at least 12 times...
what a craftscat ! [some might say, pest...]



finally the door was hung & fitted...[it opens in...]



here you see the completed bench panel...
[receiving Mackie's sniff of approval...]



the completed door...



the finished right high trim/frame detail...



and the finished left high trim/frame detail...

and finally...



the completed shower door/glass...just as I imagined it...

WHOO-HOO !!!

tomorrow, if it doesn't rain, they'll do the lower sash window glass...
in the afternoon...

now all I need is hot water in the shower...

AND IT WILL BE DONE !!!

altogether now, "WHOO-HOO!"

Tuesday, February 3, 2009

...the tile/grout has been sealed...

J1 came this AM & did the final tile/grout seal...
the gallon jug costs almost $100.00...
but when liberally applied, then wiped off...
it makes the tile easier to keep clean...
as well as the grout...makes it last longer too...



it only took about 20 minutes...
he says there may be a slight haze, but it'll wipe off...
he took some pictures of the tile work for his archives...
and after another apology about the door snafu...
which wasn't his fault, he was gone...



I turned on the exhaust fan and closed the door...
to prevent cat depredations, although the sealant is smelly enough...
I don't think they'd go in there anyway...

and now, I wait to hear from G...
about the ETA of the shower door/window glass install...
the only step left in the process...

meanwhile...

my list of chores to do while I can still use my left hand...
[before the surgery tomorrow incapacitates me for a few days...]
has been whittled somewhat...

I've "done" cat boxes & trash to be "put out" tomorrow...
I'm doing laundry & will change my bed soon...
I moved the mountain o'cat food...
I also moved most of my front porch "back"...

I still need to clean, vacuum & dust the LR/DR...
then move the furniture "back"...
including rolling out the DR rug & moving stuff back into the hall...
as well as finding a good spot for the new "dogcave"...
[Molly's crate arrived yesterday & she seems to like it...]

I need to put down the shelf paper in the bath drawers & shelves...
then start sorting and moving that stuff back...
I have to do the heavy or awkward stuff NOW...
or wait a long time....

I need to water plants everywhere...

I have to clean out the "science projects" from the 'fridge...
do dishes, clean up the kitchen...
then I need to prepare some food to eat while I'm "one-handed"...
[the codeine requires something in your stomach...]

so I have some chicken to cook as fajitas [to eat in pitas]
I also have some sandwich makings that I may make up...
'cause spreading anything on bread is hard one-handed...

there are beef/turkey burgers to form...
I also have some Garden burgers in the freezer...
and some ground meat to cook up in a casserole...
as well as some lovely salmon to bake with broccolini & rice...

if I have real food to eat that I can heat up easily...
I won't be eating "fast food" just because it's easy to do...

so I better get busy...I have a rehearsal at 6:30...
so I have about 5 hours to get this all done...

Saturday, January 31, 2009

...the light , on the ceiling of the bathroom

remember this ?



this was the cover of the light/exhaust fan in my bath...
the old, dirty, discolored & cracked in 2 places...
NASTY... light cover [aka "lens cover"]
which was nearly 20 years old and the model was discontinued...

so after fruitlessly searching for a replacement of the original...
I decided to see if I could find something at least close...
hoping against hope that the entire unit, which works just fine...
wouldn't have to be replaced [$$$]

I found a great website by searching "Broan parts"...
[www.RepairClinic[dot]com]
they specialize in "appliance parts" & offer free, "fixit" advice...

as soon as I realized from looking at their list of parts...
that "light cover" was really "lens cover"...
I found a page that helped me whittle down the search...
[ie : brand, size, material, shape etc...]

I ended up looking at 4 items[w/pictures]
one looked like my "lens cover"...
it was plastic, opaque, the right size...
AND it had tabs on the side just like mine...
and was less than $12.00...

so I ordered it...

I was hoping it would arrive yesterday, so G [who's tall...]
could just pop it in...but it didn't...

this morning, I heard a knock at my door...
and there it was...

I opened it eagerly...it looked just like the old one...
[without the dirt, discoloration & cracks that is...]

I got my step ladder, reached up...
and it popped right in, like a charm...

hmmm...another "coincidence"?...

methinks NOT, yet again...



I've tangled with the cover, changing light bulbs for years...
and always had a tussle...[that's why there's a CFL there now...]
I'm also guessing that the lower heat level of the CFL...
will prevent this one from cracking...

so at this moment, I'm really pleased with myself...



only one thing is annoying me...

the set of new "celadon green" towels I bought & just put out...
seem the wrong green...they seem too "lime", NOT "celadon"...

they were called "celadon" and in the box, after they arrived...
they looked right...[the DR's a different light]
but in the complex bathroom yellowish/natural/reflective light...
last night & early this morning...
they just looked wrong...way too neon...

of course, that was this morning & last night...
in total harsh, glaring light...
before I got & installed the lens cover...

it doesn't seem so bad now...
besides, they are almost the same color as my robe...
maybe I'll just take a pill or two...
& rest my not quite as sore hand...

maybe if I get my hand really mellow...
[& me along with it, not obsessing on the little things...]
I will see it as something that I can like...
[I love my celadon green chenille robe...]

& then, mellowed-out, I can do some of these chores...
the dishes, cleaning the 'fridge, laundry...
washing & making up my bed...
cleaning up the construction mess...
pruning the roses & a TON of yard work...

maybe it isn't the towel color at all...
'cause just reading all that made me tired...

onward & upward...

or, perhaps... a nap !

Friday, January 30, 2009

...a "full"-filling day

this was the scene around noon...



the woodwork/trim/window/door...
all had been painted and the tape removed...
[G worked with the door closed...
due to the innate snoopy-ness of SPie...]



the built-in drawers had also been painted...



as well as the medicine cabinet & its mirrored door...
which could now be mounted and hardware attached...

just before I left to run a couple of errands...
the UPS guy came... bringing these...



the gloss black rocker switches...



and the gloss black GFIC outlet I ordered yesterday...

I had paid extra to have then 2nd Day Air...
so I was really surprised to see them today...
until I saw that kyledesigns[dot]com...where I got them...
was in Livermore, just over the hill, about an hour's drive...

I was really happy to have them NOW, so G could put them in...
and I was even happier, when an e-mail arrived from kyledesigns...
refunding me my 2nd Day Air payment...


very cool...! I've never had that happen before...the refund, I mean...

and besides bringing the black electrical stuff...



the UPS guy also brought these...
the chrome pyramid knobs for the built-in drawers...
which were now painted & ready for the knobs...

perfect timing...

of course, "there was not all joy in Mudville"....



as somebody's cave was no longer "available"...

[tough tuna, SPie...hee,hee...]



the new shower head was installed...



there has been some concern about the hot water side...
losing pressure as it "runs"...
but we'll have to address that when the shower can be used...



as you can see, everything is "in" & hooked-up...



but the drain hasn't been opened yet...
the tile/grout needs the final seal before hot water "runs" on it...
and that will probably be next week...
as will the door install, though that date hasn't been set yet...

I just HAD to have this put in, though...



this is the view from the shower...



this is "straight-on"...

notice the background obscured pattern...?
G, who has seen the "rain" pattern I'm getting...
for both the shower glass AND the lower window...
says it is very close to the "rain" pattern...

hmmm...

coincidence ?

methinks, not...



oh, and you can expect to see pictures...
of the stained glass colors playing on the tile...
at the appropriate time of year...



hear you see a "pulled back" look at the black GFIC outlet...



and the fully mounted & finished medicine cabinet..



see how the light changes in a matter of minutes ?
[BTW...I love all the cool reflections...]



and inside, where the tempered glass shelves...
once again have green edges...[so cool...]



and yet another, happy coincidence[?]...
my Sonicare toothbrush, which will live here...
has green on it that "matches"...



the back of the door has been painted...
lost the old "stop" & coat hook rack...
gained a couple of chrome, "period" coat hooks...
a chrome door stop on the top hinge...
and the 2nd nickel towel bar that G cut-down...
and mounted so it wouldn't hit any tile or the wall...

and as he was packing-up to leave...
G said, "Oh, while you were gone...
I went into the back yard...
and put the new vent cover in place...
so you won't have any more "critters under the house..."



I had mentioned it to him once...
4 weeks ago...& he remembered...
what a great guy !

so now...

there's only the final tile/grout seal...
and the door/glass/window glass install...

so for me..there's some of this...



vinyl shelf liner for the drawers, cubbies...
& the bottom of the medicine cabinet...
in a day or 2, after the paint "cures" a bit...



then there's lots of bath stuff to sort...



I may have unsolicited help for that...


and I may need it...because my dislocated finger...



is NOT happy...



there is still a lot of discoloration & swelling...



with some weird skin peeling, new redness...
and extreme tenderness in the 2nd joint...



I can't make it any straighter than this...
and it's starting to throb at night...
it also hurts when I use the fingers around it...
so instead of it getting better...
it's getting worse...

I'm having more trouble doing simple things I had been doing...
washing dishes, cooking...even dressing...
are all becoming a problem...

but what disturbs me most...



is the extreme crookedness...

it's like a hammertoe finger...
and the part that rubs[goes under] the ring finger...
is really losing sensation, while the joint is getting very sore...

I can't wait until my orthopedic appointment on Monday, 9:30 AM...

until then, I just have to put up with it...

but doesn't the bathroom look nice ?